LESS WASTE, LABOR & TIME. Because SIPS are fabricated specifically for the job in the manufacturing facility and due to the repetitive/simple structure, there was very little waste (both physical & labor/time) associated with the roof structure of the Sewanee Inn and Conference Center project.
The Sewanee Inn and Conference Center project started out as a nail-base project. As the project estimator and SIPS sales discussed options, the Bell & Associates project manager decided that utilizing SIPS would save on labor for the project due to the expanse of roofing needed to be installed.
PROJECT DETAILS:
- Architect: Earl Swenson Associates, Inc.
- Contractor: Bell & Associates Construction
- Project Size: 46,500 sq. ft, 43 guest room, 2-story hotel & conference center
- Premier SIPS Used: 6″ roof